Installing inspection cells live around production — minimum downtime, maximum confidence at sign-off.
Mechanical install
01Cell dropped into the line on a planned shutdown, aligned to the conveyor and guarded to your site's safety standard.
Reject integration
02Pushers, blowers, diverters and reject bins wired to the cell with full traceability of every rejected part.
PLC handshake
03Hardwired and Ethernet/IP, Profinet or Modbus handshake with your line PLC — proven on your live signals.
SAT & sign-off
04Site Acceptance Test on real production with a documented false reject / false accept report you can sign against.